• 地址:济南市槐荫区张庄路166号
  • 手机:15589943128
  • 电话:0531-80862518
  • 传真:0531-61311569
  • 邮编:250014
  • E-mail:huangjiaty@163.com
新闻中心当前位置:首页-新闻中心
    丙烯酸球场维修翻新的步骤
    2018-6-20 16:10:59 文章来源:www.zhdzzx.com
    一、场地清理1、针对水泥基础,应将基础表面的水泥浮浆及疏松部分清除掉,凸出部分应用铁锤或铁铲清除,还不能处理平的情况下就用磨机磨平,保证基础没有凸出部分。
    First, site cleaning 1, aiming at cement base, the cement slurry and loose parts of the base surface should be cleared away, the convex part is cleared by the iron hammer or the shovel, and the mill can not be smooth under the condition of leveling, and the foundation has no convex part.
    2、根据水泥表面的平整度,密实度,进行打磨、修补处理,使底层同基础结合的更稳。
    2, according to the smoothness and density of the cement surface, grinding and repairing will make the bottom layer more stable with the foundation.

    3、沥青表面如果油性太重不宜施工,先用大量的水冲洗,将沥青表面的油尽量冲洗干净,如有凸出部分要用大锤打平,疏松的部分要砸实。

    丙烯酸球场

    3. If the asphalt surface is too heavy to be constructed, a large amount of water is used to flush the oil on the asphalt surface as far as possible. If there is a bulge part to be flush with a sledgehammer, the loose part should be smashed.
    二、底层的刮涂爆晒:由于第一次刮涂的底料较厚(视基础平整情况,如果基础不平,局部就会很厚),因此这一层底层一定要给彻底干燥到底,不能只看到表面干燥,具体干燥时间视天气情况而定。如局部太厚干燥时间过长,可用太阳灯烤,加快它的干燥时间。
    Two, the bottom of the scratch coating: because the first coating is thick (if the foundation is flat, if the foundation is not flat, the local will be very thick), so the bottom layer must be completely dry to the end, can not only see the surface drying, the specific drying time depending on the weather conditions. If the part is too thick and the drying time is too long, you can use the sun lamp to bake and accelerate its drying time.
    试水:待第一次底料完全干燥后,全场放水,在水不流动时,在有积水的地方作出标记修补积水:(根椐场地排水系统来定)采用铝合金方在积水的地方用底料刮平,达到修补积水的目的。重复几步达到场地无积水为止。铲地:将修补和刮涂底料产生的耙痕和凸出部分彻底铲平或用打磨机磨平并清扫干净地面。
    Test water: after the first raw material is completely dry, the whole field is released, and when the water is not flowing, the water is marked and repaired in the place where the water is accumulated: (according to the drainage system of the site), the aluminum alloy square is used to scrape the water in the place where the water is accumulated, so that the purpose of repairing the water is to be achieved. Repeat a few steps to reach the site without water. Shovel land: rake and protruding parts that are repaired and scraped with bottom material are thoroughly leveled or used to grind and clean the floor.
    感谢大家在百忙之中关注公司发布的产品信息,如果你想要了解更多,可以来我们公司咨询。我们欢迎大家的光临,并与你的合作!
    Thank you for your busy schedule to pay attention to the product information released by the company. If you want to know more, you can come to our company for consultation. We welcome your presence and cooperate with you!